International investors
Apartment buildings, mixed-use buildings and small portfolios. The report contains a technical risk picture and a capex plan that a bank and a lawyer can work with.
Inspection of the property as far as accessible, review of the documents and a report on condition, defects and costs. For investors, private buyers and lenders.
Apartment buildings, mixed-use buildings and small portfolios. The report contains a technical risk picture and a capex plan that a bank and a lawyer can work with.
A house or a flat in Berlin. For a single flat or house there is the pre-purchase inspection with a written condition report.
Condition and maintenance backlog as a basis for financing decisions, refurbishment budgets and hold/sell strategies.
An executive summary with red flags, findings per building part with photos, defects classified by urgency (immediate · 1–3 years · 4–10 years), cost ranges for repair and refurbishment, a 10-year capex plan and a document checklist with gaps. In English; German on request.
The office does not broker, does not build and is not paid by the seller. Legal and tax advice are not part of the service. Opening of building parts and laboratory tests are arranged separately if a finding requires them.
Quote with the scope of services on request by email to info@ing-bassam.de.
flat or house · report in German, in English as an option · own page
apartment and mixed-use buildings · larger buildings and portfolios by quote
Yes. The inspection takes place on site with access coordinated by the office, and the findings are discussed by video call.
An inspection date within Berlin is usually available within five working days. A red-flag summary follows within 48 hours of the inspection and the full report within seven to ten working days.
The report states which documents are missing and lists them as a risk. Some can be obtained from the authorities, for example the register of public easements (Baulastenverzeichnis).
No. The report assesses condition, risks and costs. A formal market valuation is a separate task.
Berlin, with travel within Berlin included; the surrounding Brandenburg region by arrangement.
Describe your case by email, with photos and documents if available. You receive an assessment of whether and to what extent a survey makes sense, and a written quote with the scope of services.
info@ing-bassam.de · Straße am Flugplatz 6a, 12487 Berlin · Reply usually within one working day